Announcements
  • Find the Next Course Enrolment Dates

    Click here to find out when the next course start date is for each of our courses...

    Find Out More...


  • Questions? Call us FREE on:

    0800 331 7500


    City & Guilds, Logic and Part P Logos Image

    Course Diaries


    Our new course diary feature will allow you to follow our latest group of trainees on a daily basis through the progress of their course.

    Plumbing Course Group 11PB – Day 1 of our 6 Week Intensive Plumbing Course


    Pictured below are our latest trainees to undertake the 6 Week Intensive plumbing course we offer, Our Central Heating Design and Installation Course will cover all aspects of domestic heating, plumbing, fault finding and maintenance. On completion the course attendees will receive City & Guilds 6128 Level 2 qualifications. Pictured above from left to right - Glen Fryer (Tywyn), Thomas Dunne (Birmingham), Nerjus Bagdonna (Norwich), Mohammed Khan (London), Monwar Hussain (Birmingham),...

    Read More


    Group 11PB on their 6 week intensive plumbing course – Day Two


    Following on from their induction, Day 2 involves taking the plumbing group through various pipe bends and tools. Plumbing, Central Heating Design & Installation Course (6128). teaches Pipe bending and jointing skills for copper tube to City & Guilds requirements. Which will give the course attendees the proficiency to take on pipe work and design when they start their plumbing careers. ...

    Read More


    Group 11PB on their 6 week intensive plumbing course – Day Three


    Following on from Day 2 the plumbing group continue with honing their pipe skills. Plumbing, Central Heating Design & Installation Course (6128) teaches Pipe bending and jointing skills for copper tube to City & Guilds requirements. Here they are pictured working on their pipe joins. ...

    Read More


    Group 11PB on their 6 week intensive plumbing course – Day Five


    Intensive Plumbing Course group 11PB finish off their first week of training with their Copper Tube Framework Assessment. Plumbing, Central Heating Design & Installation Course (6128). ...

    Read More


    Group 11PB on their 6 week intensive plumbing course – Day Six


    Day Six finds our Plumbing Course trainees 11PB completing their final Framework Assessment, covering all the techniques looked at in their first week on the course. Plumbing, Central Heating Design & Installation Course (6128) – Features framework to a city and guilds level. ...

    Read More


    Group 11PB on their 6 week intensive plumbing course – Day Seven


    Day 7 – Our trainee plumbers attend a theory lesson, where plumbing tutor Stewart Foster takes the group through their introduction to direct and indirect cold water systems. As usual practice, the attendees take part in a theory lesson before moving on to the workshop for a related practical. ...

    Read More


    End of week 2 – Installing sanitary ware fixed pipework


    Week 2 - At the end of the week trainees were installing sanitary ware fixed pipework, which is part of the Plumbing, Central Heating, and Design & Installation Course. This is one part of the practical sessions that take place and give the trainees the practical skills they need when they have to face similar situation during employment. ...

    Read More


    Day 13 – prb11 – Bay job 2 – Central heating pipe work installation


    Day 13 begins with group prb11 working on central heating and pipe work installation. Including, hanging of radiators as you can see from the images. Trainees will be given the knowledge that the normal position for installing the radiators is under the windows then placed on a side wall. Precise measures are taken into hand when practically working on hanging radiators. ...

    Read More


    Day 14 – Complete radiator pipework installation


    After six weeks of intensive plumbing training the candidates complete radiator pipework installation in day 14. Its one of the key pipework installation to be done during this training programme. To complete radiator pipework installation a lot of hard work has to be made such as precise measurements and making sure everything fits in perfectly. Candidates did well to complete this installation where they were able to put the theory they learnt into practice....

    Read More


    Day 15 – Final Part of Bay Job 2 – Installation of 10mm pipework to radiator valves


    Day 15 involes installation of 10mm pipework to radiator valves.  This is the final part of the bay job 2 and must be completed in order to gain the qualification  Logic Foundation Cert in Basic Heating & Hot Water Systems, Design & Specification. ...

    Read More


    Day 16 – Cold water storage cistern


    Without a non-storage system for cold water in any building there will be no security of supply of cold water. In day 16 trainees  are being taught to set up  cold water storage cisterns  to City & Guilds requirements. You can get more of an idea of what they do by looking at the image below. ...

    Read More


    Day 17 – Airing cupboard installation


    Below are some of the guys who are completing the second part of airing installation course. Mark Letman and some of the other guys are starting the City & Guild Bathroom Assessment. In the above picture from left to right – Glen Fryer (Tywyn), Thomas Dunne (Birmingham), Nerjus Bagdonna (Norwich), Mohammed Khan (London), Monwar Hussain (Birmingham), Lee Edge (Sutton Coldfield), Luke Jones (London), Mark Letman (Birmingham), Gur Meroz (Coventry)....

    Read More


    Day 17 – Intricate soldering work


    As part of the  Plumbing, Central Heating, Design & Installation Course. Soldering work took place for the airing cupboard in day 17. Members of  group 11pb did well in this both difficult & complex task. Pictured below is one of our trainees Gur Meroz from coventry. ...

    Read More


    Day 18 – Monwar installing hot and cold pipework to basin


    Day 18 - From the image you can see Monwar Hussain, part of group 11pb taking part in the practical work, which is to install hot and cold pipework to basin. Monwar is very aware that any plumbing activity that involves pipework is governed by certain rules and regulations. These rules are strictly followed in our Plumbing, Central Heating Design & Installation Course....

    Read More








  • Find the Next Course Enrolment Dates

    Click here to find out when the next course start date is for each of our courses... Find Out More...

  • Phone us on 0800 331 7500